Wednesday, May 6, 2009

Quality Center Multiple Choice Questions-11

101)
The Execution Flow tab enables you to watch the execution process as it happens and to control the way your tests are executed.

A) True
B) False

102)
In the Execution Flow, a dashed line -- -- -> arrow indicates that the test

A) is to be executed after the previous test, with no conditions.
B) is to be executed only if the previous test has status Finished
C) is to be executed only if the previous test has status Passed
D) None

103)
You can delete a ....execution condition(s) connected to a test.

A) Single
B) Two
C) Three
D) All

104)
When we Run a test, in the Manual Test Run window, by default which option is selected

A) Manual Runner (Run according to the order in the
Execute Grid)
B) Manual Runner (Run according to the order in the
Executing Grid)
C) Manual Runner (Run according to the order in the
Execution Grid)
D) Manual Runner (Run according to the order in the
Execution Grind)

105)
You can assign multiple values to a parameter during a test run.

A) True
B) False

106)
If a manual test run was paused during execution, you can continue the run at a later stage.

A) True
B) False

107)
You can run tests automatically on ......

A) Your machine
B) Remote Hosts
C) Both A & B
D) None

108)
To run several test sets concurrently on multiple remote hosts, open a new Automatic Runner dialog box instance for each test set.

A) Auto Runner
B) Automate Runner
C) Automatic Runner
D) Manual Runner

109)
When you run QuickTest Professional tests from the Test Lab module, they are automatically run in Fast mode. They cannot be run in Normal mode.

A) True
B) False

110)
You can only view the Execution Log even if you did not select Enable Log in the Automatic Runner dialog box before you executed the test.

A) True
B) False

101) a, 102) a, 103) d, 104) c, 105) b, 106) a, 107) c, 108) c, 109) a, 110) b